GIS Land Intelligence Platform

Every answer.
Before you commit.

Drop any parcel. Get solar score, grid proximity, planning risk, MW capacity, and revenue range — in 30 seconds.

Enter postcode, coordinates, or drop a pin on the map...
Assess Site

Free · No credit card · UK & Germany live Q2 2025

Technology:
Overlays:
Selected Parcel
78
61
43
85
72

Score

70–100 High
40–69 Medium
0–39 Low
Live map launching Q2 2025

Site Analysis

North Yorkshire · UK

52.34°N, 1.27°W · 142 acres

78
Solbine Score™
~42 MW
Solar Capacity
£38–52k
Annual Lease Range

Intelligence Breakdown

Solar Score84/100
Grid Score71/100
Planning Risk62/100
MW Capacity78/100
Revenue Potential75/100
Development Timeline68/100

Risk Flags

ALC Grade 3b land — potential local authority review likely.

Grid queue congestion above regional average. Pre-enquiry recommended.

No Natura 2000 or SSSI designations within 5km.

AI

Solbine Copilot

"This site scores well for solar viability with strong irradiation data. Grid risk is moderate — a preliminary DNO enquiry is recommended before committing to feasibility spend. Agricultural classification warrants early planning dialogue."

Recommended next step: Submit preliminary grid enquiry →

Live Intelligence

Sample scored sites across Europe

View all sites
Kent, UK
Solar
85
score
Capacity~65 MW
Lease range£48–64k/yr
Grid riskLow risk
View full brief
Brandenburg, DE
Wind
79
score
Capacity~120 MW
Lease range€72–95k/yr
Grid riskModerate
View full brief
Andalusia, ES
Solar
91
score
Capacity~210 MW
Lease range€55–70k/yr
Grid riskLow risk
View full brief
Lincolnshire, UK
BESS
71
score
Capacity~80 MW
Lease range£35–48k/yr
Grid riskModerate
View full brief

What we score

Six intelligence dimensions.
One decision brief.

Every parcel returns a structured brief across all six dimensions — combined into the Solbine Site Score™.

Solar Score

Solar irradiation intensity, slope, aspect, and shading analysis. Returns a 0–100 suitability score per parcel.

Grid Score

Substation proximity, estimated voltage level, connection queue status, and curtailment risk zone.

Planning Risk Index

Environmental constraints, Natura 2000, SSSI, ALC grade, flood zone, and local policy history.

MW Capacity Estimate

Algorithmic MW calculation based on parcel size, terrain, technology type, and setback requirements.

Revenue Range

Country-adjusted lease benchmarks based on technology, grid score, and regional comparable data.

Development Timeline

Estimated permitting and connection timeline by country, project type, and planning complexity index.

Ready to assess your first site?

Free for landowners. 14-day trial for developers. No credit card.